LIVE PROJECTS


Over the coming years, key planned projects include:

Highways:

LONGITUDINAL SIERRA HIGHWAY, SECTION 4

Objective: To provide for improvement and rehabilitation works (117 km), initial periodic maintenance (503 km) and maintenance and operation of approximately 970 km of the Longitudinal Andean Highway, a major national road connecting 12 departments across the entire Andes.

INTERNATIONAL NORTH HIGHWAY

Objective: To develop road infrastructure that includes the concession of the North Pan-American Highway Sullana - Tumbes - La Paz International Bridge Detour Sector, as well as the granting of a concession for the design, construction, operation and maintenance of the road connecting the cities of Sullana, Talara, Los Órganos, Máncora, Zorritos, Tumbes, Zarumilla up to the La Paz International Bridge.

Railways:

HUANCAYO – HUANCAVELICA RAILWAY:

Objective: Integral rehabilitation of the Huancayo-Huancavelica railroad Consists in the design, finance, build, and execution, acquisition of materials, operation and maintenance.

Roads:

PERIPHERAL RING ROAD

Objective: To build a 33.2-km long beltway from “200 miles Circle” to “Circunvalación Avenue”

Ports:

NEW PORT TERMINAL OF SAN JUAN DE MARCONA

Objective: Design, finance, build, operate and maintain and new port terminal of public use, providing specialize services of storage and load of concentrates of iron and copper, as well as the supplies of mining production.